March 4, 2013

Days 21, 22, 23 and 24

Took shelves out of laundry room
New oven


Light at the sink
Chalk board that I painted
Dave and JP putting up the crown molding in kitchen



Back door added in the den
Dave and friend (TS)


Friends (RW and EW) removing hardware
Mom painting her closet

Kitchen window
Mom and Dave putting up the lights at the bar


Sorry for a delay in blogging.  It has been rough in the house, we have had sickness with Mom and Dave.  Now I have it.  So please bear with us.  You can see that TS, RW and EW came and helped us out.  We have the kitchen 3/4 done.  All the appliances are now installed.  Need to finish the bar area and DONE with that room.  Mom and I cleaned the living room floor up from all the sawing and painting items that were EVERYWHERE in there.  I vacuumed the floor and the floor looks almost new.  Mom's bathroom is completed.  Her bedroom needs crown molding and she will be ready.  Except we are leaving the hardwood floors to the very end to strip and seal.  The laundry room has the washer and dryer fixtures moved to another wall, so I will have more room to fold clothes.  I took out the shelves that was in the laundry room, so we can put the freezer in there.  We will leave that room last to do.  We are going to complete the kitchen and Mom's room; then we will start on the other rooms.  One room at a time so we can concentrate on that room.  Dave is still saying end of this month we should be ready to move in.  If not completed, I would rather get it done first and then move in.  The building outside is being disassembled this week.  Getting ready to move out new building down to Walkertown.  That means we are getting closed to being back there.  HEE HEE HEE!!  Well, I will let you know when we work some more.  Thanks for hanging in there.  Until later,

No comments:

Post a Comment